

Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon
Commercial Building, 40 Kimberley Road, Tsim Sha Tsui
Residential Building Works, 11 Sha Tin Ridge Road, Sha Tin
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangha
E&M Works Construction:
Sha Tin Fo Tan Data Center Project
Redecoration Work
Kau To Shan and Hong Lok
Projects (as Sub Contractor)
Hong Kong's Siu Sai Wan Park Drainage Project,
Government Development Department's Tin Shui Wai Wooden Bridge Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,
A&A Works Construction:
The renovation project of Sha Tin Railway Station including steel structure engineering and reinforced concrete structure works.
Steel Structure Engineering
Shanghai Lu Pu Bridge Steel Structure Engineering.
Design and manufacture of installation works:
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.
Other projects completed by the Company include: