

Projects (as Main Contractor)
New Built Works Construction:
Residential Building, No. 4 Kent Road, Kowloon Tong
Residential Building, No. 147 Waterloo Road, Kowloon Tong
Composite Development at No.245-247,Tai Kok Tsui Road, Kowloon
Seng Tak Central School Building Project, New Clear Water Road, Kowloon
Commercial Development 24A &24B Granville Road, Tsim Sha Tsui
No.8-12, Yuen Long Pau Cheung Square, Yuen Long
Composite Building On K.I.L 11238 At Nos 445-447 Shangshui street, Kowloon
E&M Works Construction:
Sha Tin
Redecoration Work
Kau To Shan and Hong Lok Yuen South Bay,
和明以主承建商的身份完(wán)成了:
1.
2.香港觀塘新清(qīng)水灣道重置香港扶幼會盛德中心(xīn)學校建築工程(整單所有項目(mù))
3.香港(gǎng)沙田嶺道11號住宅建(jiàn)築工程
4.沙田火炭數據(jù)中(zhōng)心工程(chéng)(機電(diàn)設備連裝修)
5.九肚山以及康樂園(yuán)南灣、壽(shòu)臣山、加列山等豪宅裝修等
8.九龍(lóng)塘窩打老道147
9.尖沙咀加連威老道24A&24B大(dà)廈
10.元朗炮仗坊 8-12
11.旺角上海街445號住宅大
12.
Projects (as Sub Contractor)
Civil Engineering:
Hong Kong's Siu Sai Wan Park Drainage Project,
Tung Chung Road Extension Project, and other steel structures, pavements, channel works, concrete structures and drainage works.
Hong Kong Siu Sai Wan Park Steel Structure Project, Stainless Steel Project,
Phase III Reclamation 2009/19 project of the steel railing project, airport railway depot steel structure.
A&A Works Construction:
The renovation project of Sha
Steel Structure Engineering
Shanghai Lu Pu Bridge Steel Structure Engineering.
Mobile safety fence in the Wan Chai - Central Phase II reclamation works.
土老妇人啪啪视频,柳岩啪啪啪视频,抖音怎么一次性删除喜欢视频,苍老师啪啪的视频程
其他工程